Hello, I have a question. Can I have one cyclic Load in the first 10 seconds of analysis and then have a different cyclic load in the last 10 seconds and both of them are in one job? First Cyclic Load is Force-Control and the latter one is Displacement-Control.

  • You must to post comments
Best Answer
0
0

Hello,

You can create two steps. In the first, define the Force-control load or any load you want. Then, if you want, deactivate it in the second step and define the Displacement-control load or anything else you need.

I recommend checking the link below. It’s an article about step, increment, etc. You might find it useful.

A Clear Guide to Abaqus Step, Increment, Iteration, Attempt Concepts

Best luck.